Raceway Schedule
The Raceway Schedule manages ductbanks, cable trays, and standalone conduits.
Entry workflow
- Use Sample to load a working set of raceways.
- Use Add Ductbank, Add Tray, or Add Conduit to enter common fields in a guided form.
- Ductbank conduits are created inside ductbank rows. Standalone conduits remain in the Conduit Schedule.
- Tray and conduit rows include Material so procurement, BIM export, and downstream BOM outputs can distinguish steel, aluminum, PVC, stainless steel, and fiberglass raceways.
- Use Batch Edit from a table's More menu to apply one field value to visible filtered rows or every row. Ductbanks can batch edit either ductbank rows or nested conduit rows.
- The top summary shows totals, validation issues, and raceways currently assigned to cables.
- Ductbank imports preview ductbank and nested conduit creates, updates, conflicts, and unchanged rows before applying merge, append, or replace mode.
Views and filters
Use the View menu to switch between Basic Entry, Geometry, Fill / Grouping, BIM Export, and Full Detail. The choice is saved with the project settings.
Quick filters isolate missing geometry, duplicate IDs, unused raceways, assigned raceways, ductbank conduits, and standalone conduits.
Validation
The page validates missing IDs, duplicate IDs, missing or zero-length geometry, invalid tray dimensions, invalid slot-group JSON, and illegal conduit type / trade-size combinations.